CONFIDENTIAL · Track Record · EN

YUJ · 18 UAE Curtain Wall Landmark Projects

1,752,691 m² Delivered · Abu Dhabi × Dubai · Aldar / Emaar / Mubadala / Foster / Aedas class portfolio

Source: Prequalification Package p.86-103 2026 Edition 中文版 →
18
Landmark Projects
1.75M m²
Total Facade Area
382m
Tallest Building
4
Towers ≥ 200m
8
Tier-1 Developers
328M AED
6-Month Live Pipeline

All 18 projects below were designed, fabricated and installed by YUJ in the United Arab Emirates across Abu Dhabi and Dubai. The portfolio spans four top-tier developers (Aldar / Emaar / Mubadala / Meydan) and leading international architects (Foster & Partners, Aedas, Rafael Vinoly). This track record is the "hard currency" that unlocks Co. A's entry into KSA Giga Projects — NEOM, Red Sea, Diriyah Gate and Roshn.

1. Portfolio Summary Table

#ProjectLocationClientMain Contractor / ArchitectArea (m²)HeightFacade Type
01Al Bustan Mixed Use DevelopmentAbu DhabiAl Hamid GroupAl Habtoor / Hyder130,00076 mUnitized + Stick
02Bab Al Qasr Hotel & Serviced ApartmentsAbu DhabiEMROCNurol / Surbana70,316171 mUnitized + Stick
03Nation TowersAbu DhabiInt'l Capital TradingKEO / WZMH115,159273 / 237 mUnitized Towers + Stick Podium
04Central Market RedevelopmentAbu DhabiAldar PropertiesArabian Const. / Foster & Partners / Arup118,507382 mUnitized + Stick
05The Executive TowersDubai · Business BayDubai PropertiesAl Habtoor / Design & Arch Bureau407,467206 mStick
06ADIC New HQAbu DhabiAbu Dhabi Inv. CouncilAFC / Aedas / Arup67,436145.1 mUnitized + Stick
07Central Market SoukAbu DhabiAldar PropertiesMUSHRIF / Foster & Partners19,30022 mUnitized + Stick
08New York University Abu DhabiSaadiyat IslandMubadalaAi-Futtaim Carillion / Rafael Vinoly42,46665.83 mFacade & Associated Works
09Nad Al Sheba Racecourse (Meydan)DubaiMeydan L.L.C.Arabtec-WCT JV / Teo A Khing147,00065.5 mUnitized + Stick
10Jumeirah Business Centre TowersDubaiAl Fajer PropertiesAl Ahmadiah / NEB55,200147 mUnitized
11Bay Gate Office TowerDubai · Business BayBay Gate L.L.C.BRT / MFT42,000240 mUnitized + Alum. Cladding
12JEPZA Convention CentreDubai · Jebel AliJafaz-Jebel AliAl Habtoor / Arenco87,000130 mStick
13Oberoi CentreDubaiRani Int'lDSA Architects68,000139.2 mUnitized
14Cleveland Clinic Abu Dhabi HospitalAbu DhabiMubadalaSixco-Samsung JV / Aedas189,040141 mDouble Skin + Unitized
15Al Raha Beach Al Zeina PA610Abu DhabiAldar PropertiesAldar & Anlor / Esquisse100,10060 mUnitized + Stick
16Residential Tower (Emaar)DubaiEmaar PropertiesArabian Const. / RMJM19,300135 mStick
17Zayed University Roof CladdingAbu DhabiMubadalaAl Habtoor-Murray / Obermeyer / Aurecon / Parsons52,400Roof Cladding
18Commercial & Residential Development (Emaar)DubaiEmaar PropertiesArif & Bintoak22,000107 mStick
TOTAL1,752,691≈ 1.75 M m² · 18 Projects
All 18 projects are fully documented in Co. A × YUJ Overseas Business Division's Prequalification Package (client reference letters, contracts, acceptance certificates and photographic evidence), ready for direct submission as qualification attachments for KSA MISA pre-screening, NEOM and Roshn tenders.

2. 18 Projects Portfolio

The Executive Towers
No. 05 · HERO PROJECT

The Executive Towers

🇦🇪 Sheik Zayed Road · Business Bay · Dubai
Client
Dubai Properties
Main Contractor
Al Habtoor
Consultant
Design & Architecture Bureau
Area
407,467 m² (YUJ's largest single project)
Height
206 m
Facade
Stick Curtain Walling
Largest Project Dubai Properties ≥ 200m Supertall
Al Bustan Mixed Use
No. 01

Al Bustan Mixed Use Development

🇦🇪 Plot C1, Sector E35, Abu Dhabi
Client
Al Hamid Group
Main Contractor
Al Habtoor Engineering
Consultant
Hyder Consulting
Area
130,000 m²
Height
76 m
Facade
Unitized + Stick
Large Mixed-Use
Bab Al Qasr Hotel
No. 02

Bab Al Qasr Hotel & Serviced Apartments

🇦🇪 Abu Dhabi
Client
EMROC
Main Contractor
Nurol LLC
Architect
Surbana Consultants
Area
70,316 m²
Height
171 m
Facade
Unitized + Stick
5-Star Hotel
Nation Towers
No. 03

Nation Towers (Twin Towers)

🇦🇪 Abu Dhabi Corniche
Client
International Capital Trading L.L.C.
Architect
KEO
Consultant
WZMH / KEO
Area
115,159 m²
Height
273 m / 237 m
Facade
Unitized Towers + Stick Podium
≥ 273m SupertallTwin Towers
Central Market Redevelopment
No. 04

Central Market Redevelopment

🇦🇪 Abu Dhabi
Client
Aldar Properties PJSC
Main Contractor
Arabian Construction Company
PM
EC Harris International
Architect
Foster & Partners
Consultant
Arup
Area
118,507 m²
Height
382 m (tallest)
Facade
Unitized + Stick
Tallest · 382mFoster × Aldar
ADIC New HQ
No. 06

Abu Dhabi Investment Council New HQ

🇦🇪 Abu Dhabi
Client
Abu Dhabi Investment Council
Main Contractor
AFC
Architect
Aedas
Consultant
Ove Arup
Area
67,436 m²
Height
145.1 m
Facade
Unitized + Stick
Sovereign Fund HQ
Central Market Souk · view 1 Central Market Souk · view 2
No. 07

Central Market Redevelopment (Souk)

🇦🇪 Abu Dhabi
Client
Aldar Properties PJSC
Main Contractor
MUSHRIF National Const.
PM
EC Harris International
Architect
Foster & Partners
Consultant
Arup
Area
19,300 m²
Height
22 m
Facade
Unitized + Stick
AldarFoster Series
NYU Abu Dhabi
No. 08

New York University Abu Dhabi

🇦🇪 Saadiyat Island · Abu Dhabi
Client
Mubadala
Main Contractor
Ai-Futtaim Carillion
Architect
Rafael Vinoly Architects
Area
42,466 m²
Height
65.83 m
Scope
Design & Installation of Façade
MubadalaRafael Vinoly
Nad Al Sheba Racecourse · view 1 Nad Al Sheba Racecourse · view 2
No. 09

Nad Al Sheba Racecourse (Meydan)

🇦🇪 Dubai
Client
Meydan L.L.C.
Main Contractor
Arabtec – WCT Engineering JV
Architect
Teo A Khing (TAK)
Area
147,000 m²
Height
65.5 m
Facade
Unitized + Stick
Landmark Racecourse
Jumeirah Business Centre · view 1 Jumeirah Business Centre · view 2
No. 10

Jumeirah Business Centre Towers

🇦🇪 Dubai
Client
Al Fajer Properties
Main Contractor
Al Ahmadiah Contracting
Consultant
N.E.B.
PM
PMG – Project Management Group
Area
55,200 m²
Height
147 m
Facade
Unitized
Office Tower
Bay Gate · view 1 Bay Gate · view 2
No. 11

Bay Gate Office Tower

🇦🇪 Business Bay · Dubai
Client
Bay Gate L.L.C.
Designer
BRT Engineering GmbH
Consultant
MFT
Area
42,000 m²
Height
240 m
Facade
Unitized + Alum. Cladding
240m Supertall
JEPZA Convention · view 1 JEPZA Convention · view 2
No. 12

JEPZA Convention Centre, Food Court, Offices & Hotel

🇦🇪 Jebel Ali · Dubai
Client
Jafaz – Jebel Ali
Main Contractor
Al Habtoor Engineering
Architect
Arenco
Area
87,000 m²
Height
130 m
Facade
Stick Curtain Walling
Mixed Hospitality
Oberoi Centre
No. 13

Oberoi Centre

🇦🇪 Dubai
Client
Rani International Dev. Co.
Architect
DSA Architects International
Area
68,000 m²
Height
139.2 m
Facade
Unitized Curtain Walling
5-Star Hotel
Cleveland Clinic · view 1 Cleveland Clinic · view 2
No. 14

Cleveland Clinic Abu Dhabi Hospital

🇦🇪 Abu Dhabi
Client
Mubadala
Main Contractor
Sixco-Samsung JV
Architect
Aedas LLC
Consultant
Langdon
Area
189,040 m²
Height
141 m
Facade
Double Skin + Unitized
Double SkinMubadalaHospital Grade
Al Raha Beach Al Zeina · view 1 Al Raha Beach Al Zeina · view 2
No. 15

Al Raha Beach Development – Al Zeina PA610

🇦🇪 Abu Dhabi
Client
Aldar Properties PJSC
Main Contractor
Aldar & Anlor
Delivery
Aldar Laing O'Rourke
Consultant
Pell Frischmann
Architect
Esquisse Design Studio
Area
100,100 m²
Height
60 m
Facade
Unitized + Stick
AldarSeafront Residential
Emaar Residential Tower
No. 16

Residential Tower (Emaar)

🇦🇪 Dubai
Client
Emaar Properties PJSC
Main Contractor
Arabian Construction
Consultant
RMJM
Area
19,300 m²
Height
135 m
Facade
Stick Curtain Walling
Emaar
Zayed University Roof Cladding
No. 17

Zayed University Roof Cladding

🇦🇪 Abu Dhabi
Client
Mubadala
Main Contractor
Al Habtoor – Murray & Roberts
Architect
Obermeyer Engineering Consulting
Consultant
Aurecon
PM
Parsons International Ltd.
Area
52,400 m²
Facade
Roof Cladding
MubadalaRoof System
Emaar Commercial & Residential
No. 18

Commercial & Residential Development (Emaar)

🇦🇪 Dubai
Client
Emaar Properties PJSC
Architect
Arif & Bintoak
Consultant
Arif & Bintoak
Area
22,000 m²
Height
107 m
Facade
Stick Curtain Walling
Emaar

3. Recent 6-Month Live Pipeline

Beyond the 1.75 M m² historical track record, YUJ has maintained an active booking tempo over the last 6 months6 projects / 10 sub-packages / AED 328.83 M (≈ RMB 437 M) already in one of five pipeline stages, proving YUJ remains a live operating envelope contractor, not just a historical brand.

51.05M AED
Awarded
≈ RMB 68 M · 3 pkgs
80.08M AED
TBC · Variation
≈ RMB 106 M · 3 pkgs
45.00M AED
Under Negotiation
≈ RMB 60 M · 1 project
18.00M AED
Waiting for LOI
≈ RMB 24 M · 1 project
134.70M AED
Quotation Stage
≈ RMB 179 M · 2 projects

Basis: amounts in AED (UAE Dirham); RMB conversion at document-wide rate 1 AED ≈ 1.33 RMB · Coverage: Abu Dhabi × 5 / Dubai × 1

#ProjectLocationSub-packageAmount (AED)≈ RMBStatus
1BalghaiylamAbu DhabiFINS works7.07 M≈ 9.4 MAwarded
NSM works11.98 M≈ 15.9 MAwarded
Addendum scope29.08 M≈ 38.6 MTBC
2Baniyas WestAbu DhabiW&D (Windows & Doors)32.00 M≈ 42.5 MAwarded
Balustrade34.00 M≈ 45.2 MTBC
Handrails & others17.00 M≈ 22.6 MTBC
3Ville 12 Masar CityAbu DhabiAlum & Glazing45.00 M≈ 59.7 MUnder Negotiation
4Reem Hills Villas Phase 01Abu DhabiACP works18.00 M≈ 23.9 MWaiting for LOI
5Nawayef Villas HudayriyatAbu DhabiAlum & Glazing Phase 147.00 M≈ 62.4 MFinal Quotation
6PASSO 2 Towers + VillasDubaiAlum & Glazing87.70 M≈ 116.4 MFirst Quotation
Total · 6 Projects / 10 Packages328.83 M AED≈ RMB 437 MAwarded 3 · TBC 3 · Neg 1 · LOI 1 · Quot 2
Reading the pipeline: (1) Awarded + TBC = AED 131 M (≈ RMB 174 M) already on YUJ's desk — both Balghaiylam and Baniyas West are repeat clients, evidencing Abu Dhabi customer stickiness transferable to KSA; (2) Quotation stage AED 134.7 M (≈ RMB 179 M) includes the Dubai PASSO twin-tower single package of AED 87.7 M — YUJ is scaling from Abu Dhabi to Dubai, directionally aligned with the KSA overseas path; (3) The 10 sub-packages span W&D, Balustrade, ACP, Alum&Glazing, FINS, validating the "comprehensive envelope sub-contractor" positioning rather than a single product.

4. Qualification Significance

DimensionDataRelevance to KSA Giga Projects
Cumulative facade area1,752,691 m²1.75× the 1 M m² minimum for KSA Vision 2030 major tenders
200m+ supertall towers4 (273 / 273 / 240 / 206 m)Mandatory reference for NEOM The Line / Trojena / Roshn supertalls
Double Skin / Complex facadeCleveland Clinic — 189,040 m²NEOM-grade energy & hospital-clean envelope already executed
Tier-1 developersAldar ×3 / Emaar ×2 / Mubadala ×3PIF-class sovereign credit benchmark
Top architectsFoster ×2 / Aedas ×2 / Rafael Vinoly ×1Same class of architects leads NEOM / Diriyah Gate
Top main contractorsAl Habtoor ×4 / ACC ×2 / Samsung ×1Highly overlapping with KSA Giga main-contractor pool
Bottom line: YUJ's 1.75 M m² UAE track record is currently the top-tier curtain-wall credential among Chinese overseas players — not just in quantity, but also in the three-dimensional combination of client × architect × facade complexity. That is half of what Co. A gains by partnering with YUJ on the Middle East play.

← Business Case (EN) · 中文版 · Table of Contents